Repairs can be made to historic Slindon Estate gateway
and live on Freeview channel 276
Plans were submitted for repairs and alterations to the Slindon Estate Gateway at Fontwell, including replacement of the existing post and wire fence/gates with new black metal Estate fence.
The application included a new pedestrian crossover to link either side of bridleway (including re-alignment of the bridleway to match the official route), replacement of the existing road sign and localised repair of the bridleway surface.
Advertisement
Hide AdAdvertisement
Hide AdThe application is a dual parish application with Slindon Parish Council and is a cross boundary application with the South Downs National Park Authority.
The application said the timber picket gates were in poor condition and needed replacing and a new kissing gate would be added to deter cyclists using the footpath.
The new gates would be locked to 'stop interaction with the general public'.
To view the decision go to the Arun planning portal and use the search reference WA/51/22/PL.